On the bridge through the river Pjaku-Pur movement is restored
On the bridge through the river Pjaku-Pur movement is restoredOn the bridge through the river Pjaku-Pur movement of cars by load-carrying capacity to 30 tons is restored. The increase in loading at the bridge has occurred in connection with an establishment of low temperatures and ice strengthening on the river.
Let's remind, in the end of October the bridge on an entrance to a city Tarko-fat has temporarily terminated in connection with the admission ice.
Назад 1 2 Вперед
Вестник заполярья

Популярные фильмы в кинотеатрах